Table of Contents Table of Contents
Previous Page  337 / 338 Next Page
Information
Show Menu
Previous Page 337 / 338 Next Page
Page Background

D-103

Additional information

Maintenance

Correctivemaintenance

General

General recommendations

bb

Before any intervention on the connections, switch off the cubicle, remove the

protective screens and the partitioning sheets and boxes.

bb

When reassembling the connections:

bb

use new screws, washers, nuts of the same type (class 8.8)

bb

tighten to the defined torque (refer to the tightening torque table in chapter

"Connection/Connection of power cables")

bb

apply varnish.

Hot point

Screwed connection

bb

Identify the cause: generally a loosening connection.

bb

Dismantle the assembly.

bb

Clean and rub down surfaces in contact (e.g. sandpaper N° 400).

bb

Set the connection up.

Maintenance after a fault has occured

The high currents resulting from a fault cause damage to structures, components,

busbars and cables.

Following a fault, contact your local Schneider Electric office.

Troubleshooting and interventions

For any interventions other than those described in this manual,

contact your local

Schneider Electric agency.

7-DESW016ENInfoscompl

16/04/2014

Version : 4.0