Total Solution to Earthing & Lightning Protection |
9AKK106354A3360
11/3
11
Mains protectors for specific sytems
Fire/intruder alarm panels and CCTV systems
Photovoltaic (solar) panels
Mains power protection
Product selector - Service entrance to terminal equipment
Ground
Level
LPS
Power
Unknown
Ground
Level
Power
Ground
Level
LPS
Power
Data
Telecom
Water
Gas
No external lightning protection system LPS fitted,
3 Phase 415V TN-S or TN-C-S mains supply -
exposed overhead supply feed
External lightning protection system LPS fitted,
multiple connected metallic services (gas/water/
data/telecom) 3 Phase 415V TN-S or TN-C-S mains
supply
External lightning protection system LPS fitted,
metallic gas/water/ data/telecom services -unknown
3 Phase 415V TN-S or TN-C-S mains supply
Installation Locations
Service entrance - after meter
Sub Distribution Board (SDB) - Critical terminal equipment -
Sturcture configuration - typical
Main Distribution Board (MDB)
located > 10m from MDB
located > 10 m from SDB
No external lightning protection system LPS fitted,
3 Phase 415V TN-S or TN-C-S mains supply -
underground supply feed
ESP 415 D1 Series
or
ESP 415 M1 Series
For 3 Phase 415V supplies
See pages 11/10 and 11/14
ESP 415 D1 Series
For 3 Phase 415V supplies.
See page 11/10.
ESP MC Series
Hospital/Laboratory/Server
equipment. See page 11/26.
ESP MC/TN/RJ11 Series
Fax machines/Modems
See page 11/26.
ESP MC/Cat-5e Series
Computer network hubs
See page 11/26.
ESP 415 M1 Series
For 3 Phase 415V supplies.
See page 11/14.
ESP In line mains
up to 32 Amps.
See pages 11/22 & 11/24
Fire/Intruder alarm panels
See page 11/20
ESP 240 D1 Series
For single phase 240V
supplies. See page 11/6.
ESP 240 M1 Series
For single phase 240V
supplies. See page 11/14.
ESP 415 D1 Series
or For 3 Phase 415V
supplies
ESP 415 M1 Series
See pages 11/10 and 11/14
ESP 415/III/TNS Series
or where electronics
are located near MDB before SDB use
ESP 415 M2 Series
See pages 11/6 and 11/12
ESP 415/I/TNS Series
for LPS to LPL level I and II
ESP 415/III/TNS Series
for LPS to LPL level III
and IV or where electronics
are located near MDB
before SDB use
ESP 415 M2 Series
for
LPS to LPL level III & IV
are located near MDB
before SDB
ESP 415 M4 Series
for
LPS to LPL level I & II are
located near MDB
Ground
Level
Power
ESP PV Series
Photovoltaic
(solar) panels
See page 14/8.
See pages 11/4 and 11/12