Table of Contents Table of Contents
Previous Page  50 / 100 Next Page
Information
Show Menu
Previous Page 50 / 100 Next Page
Page Background

50

HAVELLS

s !T LEAST

OF ENERGY CONSUMPTION IN BUILDING LARGER

than 500m2 must be accounted for

s !N ENERGY PERFORMANCE CERTIlCATE DEMONSTRATING

compliance is required for every building

s !UTOMATIC METER READING !-2 IN ALL NEW BUILDINGS

over 1000m2 must be incorporated

s !DDITIONAL METERING WOULD BE REQUIRED FOR PLANT ITEMS WITH

input powers greater than or equal to those shown.

Havells offers a comprehensive solution to metering and

measuring energy consumption in buildings. The key

for Havells is our understanding of regulations, future

requirements for metering and what it means to the installer.

The range of metering solutions includes both integrated and

retrofit with features such as ease of install, pre-configuration

(reducing risk of errors) and MID options making the

installers life easy when considering metering.

The requirements for Sub metering of electricity in non-domestic buildings mandated in Part

L2 of the building regulations for England and Wales have recently been mirrored by the newly

introduced Scottish building standards published in October 2015.

As an additional legal requirement, landlord billing of electricity in commercial buildings must be

from ‘approved meters’ only. It is a criminal offence to use a non approved meter for billing.

A Guide to Metering Solutions

Plant item

Rated input

power (kW)

Boiler installations comprising one or more boilers or

CHP plant feeding a common distribution circuit

50

Chiller installations comprising one or more chiller

units feeding a common distribution circuit

20

Electric humidifiers

10

Motor control centres providing power to

fans and pumps

10

Final electrical distribution boards

50