109
Use a right hand end feed unit (without monobloc)
To position the tap-off boxes correctly, the neutral
conductor of the riser mains must be on the left
side of the length
Use one or more suspension brackets for the
vertical lengths, according to the weight of the
whole riser mains
For risers that are shorter than 4 m, fix to the base
with type B brackets (see p. 81)
When longer, use a type A suspension bracket
(see p. 81) every 300 kg of riser (including boxes)
Use a standard suspension bracket to hang the
busbar every 2 metres of riser mains
Use lengths with tap-off outlets (see p. 66)
Use S120 fire barrier kit for each compartment floor
(see p. 69)
Tap-off boxes can be installed in the tap-off outlets
and near the connection between lengths
In both cases, the boxes extend downward
Position the IP 55 end cover at the end of the riser
mains
1
2
3
4
5
6
7
SCP
super compact busbar
installation guidelines
7
5
3
4
6
2
1
N
N
N
N
N L1 L2 L3
n
Installation design
For further information,
please contact us on +44 (0) 845 600 6266