Table of Contents Table of Contents
Previous Page  22 / 327 Next Page
Information
Show Menu
Previous Page 22 / 327 Next Page
Page Background

PRODUCTS BY APPLICATION

Tel

+44 (0)1424 856600

Fax

+44 (0)1424 856611

Technical Hotline

+44 (0)1424 856688

Case Study 2

Marshall-Tufflex trunking keeps

Pace with prestigious project

The impressive refurbishment of the Pace Building

within Durham University’s Palace Green Library

demonstrates how well-specified cable management

can enhance the final look of a project. The 1960s part-

listed Pace Building unites wood, exposed steelwork,

concrete and glass to provide users with a beautifully

executed modern, hi-tech environment in which to do

research and to study.

Each of the many desks within the library have power

delivered by Marshall-Tufflex’s charcoal-coloured

Sterling Profile 1 dado trunking where a perimeter cable

management solution was required.

Project mechanical and electrical building design

consultant Desco, turned to Marshall-Tufflex to provide

cable containment that combined looks and performance

and was in-line with the architectural aesthetic of

the building. Sterling Profile delivered the required

style, colour and finish for the project together with

functionality: as well as looking good the 167x50mm

trunking has three segregated compartments that can be

further subdivided as required, making it an attractive and

flexible solution.

The second key requirement of the project was an

underfloor power delivery solution suited to the open

plan environment of the building. For this Marshall-

Tufflex’s in-screed floor distribution system was specified.

22 |

Case Study 1

Nice and easy with Twin165 Trunking

Twin165 data compliant trunking system had no trouble

impressing both Ormiston Victory Academy and the

Dodd Group’s project team of its specification merits for

the academy’s purpose-built building in Norwich.

“It ticked all the boxes and that of our client,” said Alan

Hensby of Dodd Group Eastern, electrical and mechanical

contractor for the project. “As a trust, Ormiston Victory

Academy took an active role in selecting products for the

new school building, which included looking at samples.”

“Marshall-Tufflex came out best when we looked at

different cable management options & it provided value

for money compared with the competition,” added Mr

Hensby. “We particularly liked the simplicity of its design

and ease of installation when up against time. Some

systems we considered were fragmented and not tamper-

proof. Being a tamper-proof, all-in-one unit with double

compartments, Twin165 gave us the depth of capacity

we required without being over-bearing in width, easily

fitting spaces around windows & radiators. It also gave us

flexibility for future-proofing without disturbing the fabric

of the building. We like nice & easy trunking!”

Some 284 lengths of Twin165 in white

with grey lids to meet DDA requirements

were installed within the new academy

building by Electrical

Engineering Services,

King’s Lynn.

Cable management for office environments