Table of Contents Table of Contents
Previous Page  24 / 44 Next Page
Information
Show Menu
Previous Page 24 / 44 Next Page
Page Background

24

klik • Technical

5mm

40mm

5mm

2mm

1. Strip cable as above -

Note: Trim cable tails to

double over for better

terminal contact.

2. Remove plug cover.

3. Pass cable through plug cover

centre hole.

4. Terminate conductors into

terminals.

5. Push outer sheath of cable

firmly into jaws of sheath grip,

making sure that at least 2mm

of sheath protrudes below the

grip.

6. Refit cover.

klik 4 pin

Installation

klik Mounting Box Installation

Cable entry through spout in base of box for maximum wiring space.

MB2 knockouts in base and sides. Supplied with M4 x 20mm long

fixing screws.

MB3/E is dual purpose box for flush mounting in solid or partition

walls. Provided with mounting wings for partition use. Supplied with

M3.5 x 20mm long fixing screws. Cable entry in one end.

Flush Mounting for Solid Walls

Flush Mountings for Partition Walls

The mounting wings act as a flange, stopping the box from being

pulled out of the partition.

Cat No. S21

Cat No. MB3/E

less wings

Cat No. MB3/E

Mounting Methods

• Hanging from ceiling

suspension system with

Caddy Clips™

• Direct fixing to lighting

trunking

• Direct fixing to ceiling or wall

with No. 8 screws

Drop rods on sides

Screw to surface

Drop rods on rear

Top

Rear

Bottom