INTEGRAL METER KIT
I
Integral meter kits suitable for mounting within 125A or 200A type B
Meter Ready
(
MR) Distribution Boards. Includes a Digital energy meter,
three current transformers, fuses, wiring looms and mounting base plate.
Description 125A 200A
Integral Meter Kit
125
MP/50 200MP/120
Integral Meter Kit (MID)
125
MP/50/MID 200MP/120/MID
Description 200A
Integral Meter Kit 185mm
2
cable
200
MP/185
Integral Meter Kit 185mm
2
cable (MID)
200
MP/185/MID
• 125
A Integral meter kits are designed for use in conjunction with
modular three pole incoming options only. For other incoming options
select the ‘add-on‘ assembly seen below.
• 200
A Meter kits accepting up to 185mm
2
cable will require the
addition of a cable spreader box, 18PSCSB.
125
MP/50
SINGLE METER PACKS
I
245
mm high ‘add on’ assemblies suitable for mounting directly beneath
any surface 125A type B Distribution Board. Includes a digital energy
meter, three current transformers and all associated fuses and wiring.
Enclosures have a slotted front plate and hinged door with catch offering
a lockable option.
Description 125A
Add-on Meter Pack
18
MPSC125
SUB METERING
Sub metering provides an awareness of energy use. Trends of minimum and
maximum demand become visible enabling any instances of energy waste to
be identified.
Metering alone cannot reduce energy consumption or subsequent carbon
emissions -
action taken based upon knowledge gained from an
effective metering strategy can
.
Schedule 7 of the Electricity Act 1989 requires that all meters must be approved
for use in a billing situation. MID (Measuring Instruments Directive) approved
meters have, since 2006, been approved for billing purposes across the EU.
POLESTAR COMPACT SUBMETERING OPTIONS
18
MPSC125
200
MP/120