Material Cost
The lower window shows the
material build-up automatically
sectioned according to the Product
Group (Main Index) that each item
belongs to.each item belongs to.
1
Labour Cost
The lower window shows the number of hours and cost
for each labour type. You can alter the text and adjust
the £/Hour for each labour type. Changes made here
will also be shown when the Labour Tab is selected. All
prices will automatically be re-calculate and all the
items in your quotation which use an adjusted rate will
be updated
2
3
Extras
Extras can be added and removed in exactly the same
way as the Preliminaries
4
Tender Sell
The lower window shows a totals summary, with each
total shown both as a percentage of sell and as a
percentage of cost.
5
Provisional Sums
Provisional Sums
Tender Sell
These can be added and removed in exactly the same
way as the Preliminaries. The
total
is shown separate to the
price
6
The costing screen is split into two windows. The upper window always displays the price build-up, and the lower
window changes according to which item is highlighted in the upper window as follows:
Costing
Preliminaries
<Del>
<Down Arrow>
Qty Unit £ Total £
Save As Default
You can remove items from the default list by pressing
or add your own items by going to the last entry
and pressing
. There is no limit to the
number of entries. For each entry you can type in the
and
, and
is automatically calculated.
The totals in the upper window are also re-calculated.
You can click on the
button to save
the settings as Electrika defaults (only the text will be
saved with a default quantity of 1)
This window always
displays the price build-up
This window changes
according to which item is
highlighted in the upper
window
The Main Contractors
Discount can be changed
under under the settings tab