Table of Contents Table of Contents
Previous Page  362 / 576 Next Page
Information
Show Menu
Previous Page 362 / 576 Next Page
Page Background

362

New

Spacial S3D

Seismic and nuclear enclosures

Ademandingnuclearmarket

Our range of

Spacial 3D nuclear

cubicles

meets the K3 requirements of RCCE 2012.

The Schneider Electric cubicle production

plant has established processes to ensure

K3 certification.

Establishment of a line architecture adapted to the

requirements mentioned in RCCE 2012, implying:

• Hold points;

• Check points;

• Control of "AIP" activities that are important

for protection

Establishment of a Particular Quality Assurance Plan

(PQAP)

Reference documents for the nuclear industry:

RCC-E, CCTR, FNP, packaging technical specification,

"PMUC" (products and materials used in nuclear

generating stations), SGAQ-2013-03, Arrêté INB 2012

Manufacturing completion report with:

b

b

Declaration of conformity.

b

b

Monitoring document.

b

b

Report and test report.