

362
New
Spacial S3D
Seismic and nuclear enclosures
Ademandingnuclearmarket
Our range of
Spacial 3D nuclear
cubicles
meets the K3 requirements of RCCE 2012.
The Schneider Electric cubicle production
plant has established processes to ensure
K3 certification.
Establishment of a line architecture adapted to the
requirements mentioned in RCCE 2012, implying:
• Hold points;
• Check points;
• Control of "AIP" activities that are important
for protection
Establishment of a Particular Quality Assurance Plan
(PQAP)
Reference documents for the nuclear industry:
RCC-E, CCTR, FNP, packaging technical specification,
"PMUC" (products and materials used in nuclear
generating stations), SGAQ-2013-03, Arrêté INB 2012
Manufacturing completion report with:
b
b
Declaration of conformity.
b
b
Monitoring document.
b
b
Report and test report.