Background Image
Table of Contents Table of Contents
Previous Page  74 / 80 Next Page
Information
Show Menu
Previous Page 74 / 80 Next Page
Page Background

74

klik catalogue 2012 • klik.system project

Case Study - 6 & 7 New Bridge Street

6 & 7 New Bridge Street

Burgin Contracting have achieved a 70 percent time saving on an electrical installation for prestigious central London offices

by using klik.system.

The installation at 6-7 New Bridge Street in Central London has used klik.system from the distribution boards right through

to final luminaires and lighting control. The prefabricated wiring system also provides power to fan coil units throughout the

seven-storey building.

Andy Collinge, electrical operations manager for Burgin stated “The system has saved us significant time in the first fix

because there are fewer hard wired connections to make. This labour saving translates into a cost saving on the job making us

more competitive in the tender.”