Case Study - 6 & 7 New Bridge Street
6 & 7 New Bridge Street
Burgin Contracting have achieved a 70 percent time saving on an electrical installation for prestigious central London offices
by using klik.system.
The installation at 6-7 New Bridge Street in Central London has used klik.system from the distribution boards right through
to final luminaires and lighting control. The prefabricated wiring system also provides power to fan coil units throughout the
seven-storey building.
Andy Collinge, electrical operations manager for Burgin stated “The system has saved us significant time in the first fix
because there are fewer hard wired connections to make. This labour saving translates into a cost saving on the job making us
more competitive in the tender.”