![Show Menu](styles/mobile-menu.png)
![Page Background](./../common/page-substrates/page0041.png)
39
DeskPod™
technical hotline +44 (0)1268 563720
raised floor systems
Custom designed DeskPods ensure bespoke requirements are matched.
DeskPod Selector Guide
l
Choose a ‘Supply Option’ – other industry standard connectors are available on request
l
Select your preferred wiring configuration
l
Circuit protection options available from MK Sentry range
l
Optional switch available for isolation
l
Choose from a range of standard and non-standard socket outlets
l
Choice of spacers and end caps also available
Supply Options
Wiring Options
OPTION ref.
DESCRIPTION
None
End cap includes 20mm diameter hole for conduit or cable gland
Pre-wired to Tap-off
Module can be supplied pre-wired to supply cord or powertrack tap-off
3
Pole Connector
Wieland GST* or Wago Winsta** standard power
4
Pole Connector
Wieland GST* or Wago Winsta** clean earth system
Dual earth conductors for compliance to High Integrity Earthing
=
,
BS 7671:2008
IEE Wiring Regulations
All end caps include fixing bracket.
*
Wieland GST connectors include retaining clip to minimise risk of accidental disconnection.
**
Wago Winsta and other components available on request.
65
mm
90
mm
90
mm
65
mm
90
mm
90
mm
OPTION ref.
DESCRIPTION
Standard
Single protective conductor
Clean Earth
Additional clean earth protective conductor
High Integrity Earthing
†
Protective conductor meets requirements for High Integrity Earthing
=
,
BS 7671:2008
IEE Wiring Regulations
Circuit Protection Options
30
mm
110
mm
30
mm
OPTION ref.
DESCRIPTION
Unit Fuse
12.5
A High breaking capacity ceramic fuse to BS EN60127-2
Fuse length: 32mm Fuse diameter: 6.35mm
MCB
16
A*, Type B, Single Pole, 6kA (MK Sentry)
RCD
16
A, 30mA tripping current, Double Pole, 6kA (MK Sentry)
RCBO
10
A*, Type C, 30mA tripping current, Double Pole 6kA
*
Alternative lower circuit protection ratings available on request.
All circuit protection devices are from the MK Sentry range.
RCD’s do not provide overcurrent protection.
Circuit Isolation
OPTION ref.
DESCRIPTION
Double Pole Neon Switch
Double Pole Switch with green neon, switch cover fitted as standard
Custom designed DeskPods
=
In the published 17th Edition of the IEE Wiring Regulations, these requirements are found in Regulation 543.7. (16th Edition = Section 607)
Option – None and
Pre-wired to Tap-off
Option – 3 and 4 Pole
connector