INTEGRAL METER KIT
I
Integral meter kits suitable for mounting within 125A or 200A type B
Meter Ready
(MR) Distribution Boards. Includes a Digital energy meter,
three current transformers, fuses, wiring looms and mounting base plate.
Description 125A 200A
Integral Meter Kit
125MP/50 200MP/120
Integral Meter Kit (MID)
125MP/50/MID 200MP/120/MID
Description 200A
Integral Meter Kit 185mm
2
cable
200MP/185
Integral Meter Kit 185mm
2
cable (MID)
200MP/185/MID
• 125A Integral meter kits are designed for use in conjunction with
modular three pole incoming options only. For other incoming options
select the ‘add-on‘ assembly seen below.
• 200A Meter kits accepting up to 185mm
2
cable will require the
addition of a cable spreader box, 18PSCSB.
125MP/50
SINGLE METER PACKS
I
245mm high ‘add on’ assemblies suitable for mounting directly beneath
any surface 125A type B Distribution Board. Includes a digital energy
meter, three current transformers and all associated fuses and wiring.
Enclosures have a slotted front plate and hinged door with catch offering
a lockable option.
Description 125A
Add-on Meter Pack
18MPSC125
SUB METERING
l
Sub metering provides an awareness of energy use. Trends of minimum and
maximum demand become visible enabling any instances of energy waste to
be identified.
Metering alone cannot reduce energy consumption or subsequent carbon
emissions -
action taken based upon knowledge gained from an
effective metering strategy can
.
Schedule 7 of the Electricity Act 1989 requires that all meters must be approved
for use in a billing situation. MID (Measuring Instruments Directive) approved
meters have, since 2006, been approved for billing purposes across the EU.
POLESTAR COMPACT SUB METERING OPTIONS
18MPSC125
200MP/120
22
POLESTAR COMPACT
METER I NG OPT I ONS