84
®
INNOVATORS IN CABLE MANAGEMENT
�
beam mounting
CLMU - EDF
n
CLMU – beam clamps / EDF – pendants / mounting rails
42
g
100 mm
CLMU with EDF
EDF
30
Ú
105 mm
100
Ú
600 mm
8·5 x 11
7 x 25
45
15
Ø13
L
CLMU
30
Ú
105 mm
50
Ú
600 mm
Ø 8
31
56
85
CLMU - beam clamps
Use as a clamp to attach EDF mounting rail to beams
Supplied singly without fasteners
EDF - pendants / mounting rails
Use to support 50 mm to 600 mm wide steel wire cable tray in 30 mm
to 105 mm depths in a beam mounting situation. Can also be wall
mounted (see p. 58-61), or trapeze and pendant mounted from the
ceiling (see p. 75-76)
Supplied singly without fasteners
EDF600
600
50 0·77 0·83
–
–
EDF1000
1 000
65 1·19 1·24
–
–
EDF2000
2 000
70 2·40 2·56 2·48 2·48
EDF3000
3 000
100 3·66 3·89
–
–
Cat. No.
mm
L
kg/m mm
L
daN
F
1
mm
L
2
mm
H
kg/1 kg/100 daN.m
mm mm
L
mm
L
kg/m mm
L
daN
F
1
mm
L
2
mm
H
kg/1 kg/100 daN.m
mm mm
L
GC
304L
316L
Weight (kg)
GS
All weights are given in Kilograms (kg)
Please use Cat. No. when placing your order, see p. 24
CLMU
15
0·20 0·20
Cat. Nos.
mm
L
kg/m mm
L
daN
F
1
mm
L
2
mm
H
kg/1 kg/100 daN.m
mm mm
L
Weight (kg)
GS
Securing CLMU to beams and to EDF
CLMU is secured to beams at either
side with 1 X M8 x 20 fastener per
clamp (not supplied)
EDF mounting rails pass through the
opening in the CLMFAS clamp, sit on
the underside of the beam and are
secured with the fastener
8x16
8x40
8x70
10x25
10x50
8x25
M8 X 20
x1
CLMU is secured to beams at either side with fasteners (not supplied).
EDF mounting rails pass through the opening in the CLMU clamp and
sit on the underside of the beam. 42 mm to 100 mm wide beams can
be accommodated
Securing EDF mounting rail to steel wire cable tray
Use 1 x BTRCC 6 x 20 and 1 x CE25 to
secure 50 mm to 200 mm tray EDF
For 300 mm to 600 mm tray use 2 x BTRCC
6 x 20 and 2 x CE25
n
Dimensions and weights
n
Assembly
n
Installation
BTRCC
6 X 20
x1
CE 25
x1
All dimensions (mm) are nominal
For wall mounting : see p. 58-61
➔
All weights are given in Kilograms (kg)
Please use Cat. No. when placing your order, see p. 29
For ceiling (pendant / trapeze) mounting : see p. 75-76
➔
Z+
Pre-galvanised
Hot dip galvanised after
manufacture
Continuous galvanisation
before manufacture
Stainless steel 304L
Stainless steel 316L
GC
304L
316L
For detailed information related
to finishes, refer to
p. 116-117
Key :
GS
Z+